Mutoko Lithium Polymetallic Project, Zimbabwe

+
  • 778.jpg
  • 779.jpg
  • 微信截图_20250605105949.jpg
  • 微信截图_20250605110054(1).jpg
  • 89(1749092605021).jpg

This project is situated in northeastern Zimbabwe, under the jurisdiction of Mutoko Town. It is approximately 40 km from Mutoko and about 170 km southwest of the capital, Harare. The distance from Mutoko to the mine is 30 km. The project consists of four mining license areas, with a total east–west length of about 4.7 km, a north–south width of about 2.2 km, and a total area of 4.776 square kilometers. From January to July 2024, exploration work including vein tracing, trench excavation, and drilling verification was carried out. Multiple niobium–tantalum ore bodies with potential for further exploration were identified within the mining area.